this post was submitted on 23 Dec 2023
43 points (90.6% liked)

Australia

3579 readers
51 users here now

A place to discuss Australia and important Australian issues.

Before you post:

If you're posting anything related to:

If you're posting Australian News (not opinion or discussion pieces) post it to Australian News

Rules

This community is run under the rules of aussie.zone. In addition to those rules:

Banner Photo

Congratulations to @[email protected] who had the most upvoted submission to our banner photo competition

Recommended and Related Communities

Be sure to check out and subscribe to our related communities on aussie.zone:

Plus other communities for sport and major cities.

https://aussie.zone/communities

Moderation

Since Kbin doesn't show Lemmy Moderators, I'll list them here. Also note that Kbin does not distinguish moderator comments.

Additionally, we have our instance admins: @[email protected] and @[email protected]

founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 2 points 10 months ago (22 children)

Look i hate the man. But nuclear power is the best possible energy solution we have. Nuclear energy can fix all elecyricity related global warming issues we have in a reasonable acheivable world saving timeframe.

But here we are associating what could be earths only hope of stopping the climate fuckup with the molerat man.

[–] [email protected] 17 points 10 months ago (16 children)

New nuclear power is now significantly more expensive than renewables, and almost any other form of grid-scale electricity.

It's also far, far, far too slow to build. If you started the consents process now, you might see it operational in 15 years.

Gigawatt-class units really don't scale well in smaller power grids. It's a pretty common rule in power engineering that you need enough spinning/fast reserves to cover the unexpected, instant loss of your largest generator or transmission line. That's fine if you have a 100MW grid; not so great when there's 10MW of load.

Small modular/meme reactors have thus far been rather disappointing.

Throw more solar, storage, and demand response at it with a side of synchronous condensers.

[–] [email protected] 2 points 10 months ago (2 children)

15 years

why is Australian construction this fucking slow?

the largest nuclear plant (built in Japan in the 1980s) was commissioned 5 years after the start of construction. I can't imagine safety improvements since the 1980s would triple the time alone.

[–] [email protected] 4 points 10 months ago

It's not Australian construction, it would seem to to be a Western country issue, or one potentially affecting any nuclear construction.

See Flamanville 3 ( https://www.world-nuclear.org/information-library/country-profiles/countries-a-f/france.aspx Under "new nuclear capacity"). It was started in 2007, and was estimated to be completed in 2012, but it's still not completed. It's currently scheduled to begin operating in 2024.

Oma powerplant in Japan was started in 2010, and is currently scheduled to be completed in 2026. https://en.m.wikipedia.org/wiki/%C5%8Cma_Nuclear_Power_Plant

South Korea's new Hanul reactors look like they've taken about 10 years each. https://en.m.wikipedia.org/wiki/Hanul_Nuclear_Power_Plant (The table in section "Reactors" might be interesting, as it shows the pre-2000 reactors taking only about 5 years to complete)