this post was submitted on 14 Aug 2024
275 points (99.3% liked)

Digital Art

7040 readers
1 users here now

Community rules:

How to post:

Please follow the convention of the images already uploaded so far i.e.:

Image title by Artists Name

In the description link the source to the image, and also include a direct link to the artists gallery. See previous posts for examples.

What to post:

You can post your own work here, but avoid spamming.

You can post your favourite peices here for us all to enjoy.

--

All artworks are copyright of the artists named in the posts.

Artists gallery links may contain NSFW works.

--

founded 1 year ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 2 points 2 months ago (1 children)

So actually less than you might think. Maybe 12 hours in total? I was actually trying a different workflow this time which really suited me - I pre-made a lot of assets and then effectively kitbashed my own scene from them. There's a lot of repeated elements which you don't really notice with the lighting, etc (unless you really peak close up)

[–] [email protected] 1 points 2 months ago (1 children)

Crazy. I thought a lot more.

I also thought that this is the process that everybody uses. Making things like a street sign or a bin and building a scene from there.

How did you do it before?

[–] [email protected] 1 points 2 months ago

Before I did it the other way round, and I'd start building the scene and model things as I went. The main issues with doing it that way round were that modelling became slower as the scene got more detailed (so eventually I'd give up making new things), and I also ended up modelling a lot more things because I didn't really reuse assets as much.

This may all seem like common sense and it's probably how most people work, but up to now my process was always building staff when I needed it rather than making a load of assets in advance.