this post was submitted on 31 Jul 2023
66 points (100.0% liked)

News

40 readers
2 users here now

Breaking news and current events worldwide.

founded 1 year ago
 

ATLANTA (AP) — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 5 points 1 year ago (1 children)

Look, just because it's a PWR, doesn't mean it's a bad design by default.

Fukushima was a Gen II reactor. These new reactors are Westinghouse AP1000's and they're classified as Gen III+. By comparison, Fukushima's reactors are archaic in design.

Gen III+ reactors are smaller, and are greatly simplified designs, and most importantly, have passive cooling features. Passive cooling is what Fukushima didn't have. If the external power gets cut to these new reactors for an extended period of time, AND the backup generators get knocked out too, they can leverage these passive features to cool the reactor and prevent a Fukushima-style event.

[–] [email protected] 3 points 1 year ago

That is very cool information