this post was submitted on 30 Mar 2024
3 points (58.8% liked)

AusFinance

979 readers
1 users here now

founded 1 year ago
MODERATORS
 

The whole floors needs to be ripped apart and fix the drain pipe then tiles needs to be done. I am looking at 10k-15k to fix everything.

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 2 points 4 months ago

I think it depends if you have land lord insurance or not.

Beyond that im listening to a video about the movie tennant so i was somewhat confused