this post was submitted on 24 Jul 2023
23 points (96.0% liked)

Ottawa

995 readers
4 users here now

News, events, discussions, and what not from Ottawa, Ontario.

Municipal website: https://ottawa.ca/


Rules

  1. Be polite and respectful.
  2. Please only post content relevant to the City of Ottawa or to its residents.

Ottawa on the Fediverse:

empty

Ottawa chatrooms:

Please note the following:

* All chatrooms are linked together. If you join one room your messages will be copied to the other platforms.

* Matrix is an open source and potentially distributed chat protocol. The matrix room listed is hosted on matrix.org, a somewhat centralized hub for a lot of currently public rooms. Though the protocol itself is free, libre and open source, the deployment of the protocol resembles a centralized service. This may be fixed in the future with the deployment of independent servers.

* Be aware that both Telegram and Discord are centralized proprietary platforms and do not necessarily protect your rights nor privacy while simultaneously giving power to corporations.

founded 3 years ago
MODERATORS
 

To address long-standing bearing problems in the axles of light-rail cars, the axle hub assembly is going to be completely redesigned, Mayor Mark Sutcliffe announced Monday. "That alone will not solve all of our issues, but I and the team at OC Transpo are hopeful that this redesign will be a giant step forward. At last we are working on the root problem, and not just the issues that arise from it," Sutcliffe said.

To help deal with the bearing issue in the short term, equipment will be installed at 16 points along the Confederation Line to grease up the track in tight curves, Holder said. It will take several weeks to complete the installations. Staff are also working to optimize a maintenance plan for the system, Holder said. R1 buses are currently running the length of the line, except for Cyrville station. A shuttle instead connects Cyrville and St-Laurent stations.

top 5 comments
sorted by: hot top controversial new old
[–] [email protected] 7 points 1 year ago* (last edited 1 year ago)

How many different trains are there in operation right now that have never had a problem with their bearings? Why can't they license an existing design?

Why didn't they license a known good design in the first place and avoid this whole mess?

[–] [email protected] 5 points 1 year ago

In other words, they're literally going to grease the wheels.

[–] [email protected] 4 points 1 year ago* (last edited 1 year ago)

The worst part is it's going to take minimum a year to redesign and produce a beta/prototype to test and up to 3 years to change all of them out including the new stage 2 trains that have the old design

[–] [email protected] 2 points 1 year ago (1 children)

Watching the 4pm presser... what a shitshow. Unprofessional and cheap. Oh, I meant the press conference. And the LRT, too, I guess.

[–] [email protected] 2 points 1 year ago

It seems that City Hall sees this city as just another North American suburb and not as the capital of a G7 country. Thank God for the NCC, otherwise we wouldn't have the Pathways, the Rideau Canal, etc.

load more comments
view more: next ›