this post was submitted on 15 Nov 2024
14 points (85.0% liked)

Satisfactory

1624 readers
55 users here now

The unofficial Lemmy community for Satisfactory, the factory-building and exploration game.

Useful Links:

Looking for Group?

@[email protected] started a dedicated server and welcomes Fediverse users, find out more by DMing them or joining this steam chat

Rules

  1. No bigotry - including racism, sexism, ableism, homophobia, transphobia, or xenophobia.
  2. Be respectful, especially when disagreeing. Everyone should feel welcome here.
  3. No NSFW content
  4. No ads/spamming

founded 2 years ago
MODERATORS
 

i'm kind of at a loss, splitter calculators crash when i try to use them /:

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 2 points 1 month ago (1 children)

I'm a little confused on the exact request here. Do you have those pictured lane rates now, and need to combine/ split them into the ratios above (2000, 300, e.t.c)?

[–] Blisterexe 2 points 1 month ago (1 children)
[–] [email protected] 2 points 1 month ago* (last edited 1 month ago)

If you'd like exact rates, you can use belts of various speeds & smart splitters, eg.:

Need 300, so take a higher belt (eg one of the 455) and smart split off into a mk3 belt (270), and overflow the rest. You should now have a full mk3 270 belt and 185 remaining (overflowed). From that you can smart split into a mk1 (60), and split it in two (30, 30). Take one of those and merge it with the 270 from before and you've now got 300, with 125+30 remaining for more siphoning off. Basically, 300=270+60/2.

Similarly, you could do 2000=1200+780+60/3. The rest is left as an exercise to the reader.