this post was submitted on 29 May 2024
610 points (98.6% liked)

Mildly Interesting

16906 readers
219 users here now

This is for strictly mildly interesting material. If it's too interesting, it doesn't belong. If it's not interesting, it doesn't belong.

This is obviously an objective criteria, so the mods are always right. Or maybe mildly right? Ahh.. what do we know?

Just post some stuff and don't spam.

founded 1 year ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[โ€“] [email protected] 3 points 2 months ago* (last edited 2 months ago) (1 children)

In Ohio this costs an average residential electricity customer $95/year they have to pay extra on top of their electrical bill.

Nuclear should be ran until EOL, then ideally built back up again

Arguably it has in Ohio. In 2002 a football sized hole was discovered in the top of pressure vessel eaten away by the caustic cooling water:

They bought a replacement from a mothballed nuke plant.

The plant was supposed to be EOL in 2017, but was extended to 2037.

At the same time Republican lawmakers in Ohio gave oil and gas companies full control over where wells are place, but put rules in allowing the blocking of solar and wind installations. source

Nuclear should be ran until EOL,

then ideally built back up again

[โ€“] [email protected] 1 points 2 months ago

Arguably it has in Ohio. In 2002 a football sized hole was discovered in the top of pressure vessel eaten away by the caustic cooling water:

nice.

The plant was supposed to be EOL in 2017, but was extended to 2037.

this was pretty common with 30 year EOL plants, being extended to 50 years, with extra maintenance. France has done this almost unilaterally, and skill issued pretty hard with maintenance as of recent, but that's just a skill issue.